skip to main
|
skip to sidebar
(re)presentation
thoughts, process and documentation of an honours project
Wednesday, July 21, 2010
enacting studio drag
i) film self in studio
ii) projected footage onto opposite wall and film
self atte
mp
ting to align studio
to its image
iii) project this footage
studio drag
studio drag,
projection installation (colour, sound) 8.32 mins
attempting to align my studio to the image of my studio being projected on the opposite wall
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2010
(47)
►
November
(2)
►
October
(3)
►
September
(7)
►
August
(6)
▼
July
(2)
enacting studio drag
studio drag
►
May
(9)
►
April
(7)
►
March
(11)